Wait / Joiner task#
This task does two things that both mean "do not go on yet":
- Wait: hold the path for a time, or until a condition is true.
- Join: hold the path until the other branches of the job have arrived, and go on with their lists made into one.
One task can do both: it waits first, then joins.
Wait#
| Field | What it does | On a new task |
|---|---|---|
| Wait | how long, and the unit: Milliseconds, Seconds, Minutes, Hours, Days. May hold a variable. | 0 |
| Until the following condition is true | with it, the time is the longest wait: the path goes on as soon as the condition is true, and the task fails if it is not true when the time is over | off |
| the first value, the comparison, the second value | the condition. "Leave both fields blank to always be a true condition." |
The condition is looked at ten times a second, with the values worked out afresh each time. So it can wait for something that another branch, or the clock, changes:
| Wait | Condition | Means |
|---|---|---|
30 Seconds |
none | pause half a minute, for a partner's server that needs a breath between two logins |
2 Hours |
{HH}:{mm}:{ss} Greater than datetime 18:00:00 |
go on at six in the evening, or fail if that is more than two hours away |
10 Minutes |
{ready} Equals yes |
go on when another branch has set the variable |
The comparisons are those of Conditions on a task. The two date comparisons exist only here; they read MM/dd/yyyy HH:mm:ss, MM/dd/yyyy or HH:mm:ss. Pattern comparisons here do not tell capitals from small letters.
When the time ran out: "Condition not met in specified time period", and the task's red line is taken.
A waiting run counts as running. It keeps its place on the engine, and it can be stopped while it waits.
Join branches#
| Field | What it does | On a new task |
|---|---|---|
| Join the branches that can still reach this task, then go on with their merged items | makes the task a joiner | off |
| Merge | how the lists become one: see below | Union |
| Timeout | the longest wait for branches, in Seconds, Minutes or Hours. Empty: as long as it takes. | empty |
| At the timeout | Fail (take the failure line), or Go on with the branches that arrived | Fail |
| When a joined branch failed | Go on, or Fail (take the failure line) | Go on |
| Merge | The list that goes on |
|---|---|
| Union: every item once | all items of all branches; an item that several branches bring is there once |
| Intersection: only items every branch kept | the items that are in every branch's list. An item one branch excluded, or failed on, is out. |
| Keep all: every branch's items, duplicates too | the lists one behind the other |
The branch with the lowest dot goes on with the merged list. Two entries with the same URL are one item; the lowest dot's values win.
What a joiner waits for#
Not for a fixed number of branches, but for every branch that can still get here. A branch that ended elsewhere, at End or at a failed task without a failure line, is not waited for. A branch that is still working somewhere from where a line leads here is.
So a joiner never hangs on a branch that will not come, and it needs no setting for how many to expect. A task without branches before it simply goes on: "No branches to join here; continuing."
Uses#
| To | Use |
|---|---|
| send one mail after three deliveries | Union, then the Email |
| go on only with files that reached every destination | Intersection |
| collect what several Finds found | Keep all, or Union to drop doubles |
| not wait for ever for a slow partner | Timeout 30 Minutes, Go on with the branches that arrived |
| treat one failed delivery as a failure of all | When a joined branch failed: Fail |
What it hands on#
Without the join: the items it was given. With it: the merged list.
Things to know#
- A joiner after a Jump joins the true and the false path as it joins branches.
- After a restart of the server or the engine, a joiner that had already let its list through does so again without waiting a second time.
- Waiting costs nothing but time, but a run that waits holds its room on the engine. For waits of hours, end the job and let a schedule start the next step.
- To stop a run at a point until a person lets it go on, use a breakpoint, not a long wait.