CrushMFT Documentation

Scheduled reports#

A schedule runs a report by itself and delivers the result: every morning, every Monday, on the first of the month. "Reports that run by themselves and go out by e-mail, to a folder or to a job."

Schedules are in the Schedules section of the Reports app. Making them needs the Report Manager role.

A new schedule

Making one#

New schedule, or Schedule in the menu of a report, which fills in the report and the values it has on the screen.

General#

Field What it does
Name
Enabled "Off keeps the settings and does not run."
Report which report: "Pick a report"
the report's own fields the values the report is run with: its users, folders and so on. Any where nothing is filled in.
the range the period, relative to each run: "Last month" in a schedule that runs on the first is always the month that just ended

When#

Field What it does
How often Every few minutes, Daily, Weekly, Monthly
Every every so many minutes, days, weeks or months
the week days for weekly
the days of the month for monthly. Last day is the last day of each month, whatever its number.
At the time of day
Time zone "The time above, and the report's ranges, are read in this zone."

The time zone matters for the content as much as for the hour: "yesterday" for a partner in Tokyo is not the server's yesterday.

Files#

Field What it does
Formats one or several of HTML, PDF, CSV, XLSX, JSON. Each becomes a file.
Do not deliver a report with no rows nothing is sent when there is nothing to report. For reports of failures, this turns a daily mail into a mail on bad days only.
Run once at start-up when a time passed while the server was down a run that was missed is made up for when the server is back

Delivery#

One, two or all three:

Way Fields
Send by e-mail To, Cc, Bcc; From ("Empty: the server's address"); Subject and Body; and either Attach the files or Send a link to the files
Write to a folder Folder, File name, and Overwrite a file of the same name
Start a job with the files as its items Job: the job gets the report's files as its list and does with them what its tasks say

In the subject and the file name, these are filled in:

Written Becomes
{name} the report's name
{schedule} the schedule's name
{MM} {dd} {yy} {yyyy} the date of the run

{name}-{yyyy}-{MM}-{dd} as the file name keeps every run; a fixed name with Overwrite keeps the latest.

Mail goes through the mail server set up in the Preferences. A job is the way to anything else: upload the report to a partner's SFTP server, put it into a document system, or encrypt it first. See Jobs.

Looking after them#

The list shows each schedule with when it runs: "Every day at 07:00", "Weekly on Mon at 06:30", "Monthly on 1". A selected schedule shows:

  • "Last run … : " and how it went
  • "Next run …"
  • "Runs with the access of …"
Button What it does
Save
Run now runs and delivers it once, at once: the way to test a new schedule
Delete "Delete "…"?"
Reload reads the list again

Whose eyes a schedule has#

A schedule runs with the access of the account that saved it, as that access is at the moment of the run. So:

  • a schedule saved by somebody who may see one connection group reports on that group only, whoever receives it;
  • when the account is deleted or loses the right to run reports, the schedule is skipped, with a line in the server's log: REPORT: schedule <name>: …. an alert of the type Report Alert in Preferences, Alerts tells someone ({alert_sub_type} is schedule), and Last run of the schedule shows it;
  • the folder it writes to and the addresses it mails are checked against what that account may use.

Have schedules that matter saved by an account that stays: a role account for reporting, not a person's.

Coming from CrushFTP 11#

Report schedules from version 11 are carried over. The section says so once: "Converted from v11: … Each now runs the new report that matches its old one." Such a schedule runs "with the access of a full administrator (converted from v11)" until somebody saves it again; open each one and check its report, its values and its recipients.

Things to know#

  • In a cluster, schedules run on the master server only, so each report goes out once.
  • A delivery that failed, because the mail server refused it, raises the server's alert for mail that could not be sent: Preferences, Alerts.
  • Large reports by mail fail at the mail server's size limit. Choose Send a link to the files, or write to a folder.
  • A schedule that reports on today should run at the end of the day, or use "Yesterday" and run in the morning.
  • Two more reports may run at once for schedules than for people at screens, so a busy morning of schedules does not block the app: Preferences, Reporting.
  • For watching rather than reading, use an alert: a schedule sends every time, an alert only when something is wrong. See Report alerts and expected files.